“Green coal” plan Trilogy
According to China’s technology and manufacturing capabilities, “green coal” project to be implemented in three phases, with 10 years or so the final build “green coal” demonstration stations.

First stage (2006-2011): IGC demonstration power plant construction. Beginning in 2006, 2,000 tons of focus for day-level two-stage coal gasifier dry industrialization, practical design, validation and large-scale high-temperature gas purification technology for large-scale heating of multi-joint system integration technology. Plan completed in 2011 with independent intellectual property rights 250M-level IGC station and power station simultaneously within a building “green coal” laboratory.

The second phase (2012-2014 years): perfect IGC power plants, research and development of “green coal” key technology. This stage is the consolidation and development stage technology. One is to improve and promote system integration and operation of IGCC technology, at the same time to enlarge the technical and economic gasifier demonstration; 2 is built using “green coal” laboratories for the test system, including hydrogen gas hydrogen technology, H2 and C2 separation, C2 archive and use of technology, fuel cell technology and hydrogen gas turbine power generation technologies, for the third phase of “green coal” demonstration projects and make technical preparations for the preliminary work.

Third phase (2014-2016 years): the implementation of “green coal” demonstration projects. Planned to be completed around 2016, 400MW-class “green coal” demonstration project, large-scale integrated hydrogen from coal and hydrogen power, C2 key capture and storage technology, the efficient use of coal as well as near-zero pollutants and emissions of C2 , while continually improving the “green coal” technology system reliability and economic feasibility, prepare for large-scale commercialization.

Green Power Development Plan In “green coal” program, based on January 4, 2010, Huaneng Group in Beijing, green development action plan issued declarations, decisions from the full implementation of 2010 plan of action for green development. The plan, Huaneng Group to actively participate in the national strategy to address climate change, truly change the development mode, development of low- Energy , Unswervingly follow the green, low carbon, cycle development path, to protect national energy security and promote sustainable economic and social development and make new contributions.

The plan of the main targets and the detailed schedule: First, the energy conversion efficiency has improved significantly. Love can mean supply coal consumption by 2010 will drop to 324.5 g / kWh, compared to 2005 decreased by 21 g / kWh; to 2015 fell to 317 g / kWh in 2020 fell to 314 g / kWh, and strive to achieve World coal Motor Group of advanced energy efficiency standards. Second, a significant increase in the proportion of clean energy. 2010 Days to the proportion of clean energy generation installed capacity of more than 15% increase over 2005 by about 10 percentage points; to strive for more than 35% by 2020 compared to 2005, an increase of about 30 percentage points, meet or exceed the national power industry, the average proportion of clean energy level. Third, the unit continued to reduce pollutant emission levels. Huaneng unit coal-fired electricity generating capacity of sulfur dioxide, nitrogen oxides and soot emissions in 2010 will be 66% lower than in 2005, 16% and 56%. Fourth, gradually reduce the intensity of greenhouse gas emissions. Huaneng power generation units of carbon dioxide emissions by 2020 down to 526 g / kWh, compared to 2005 decreased 30%.